DSpace Repository

Operational risk assessment framework for consumable Ice manufacturing industry: A case study of Chiang Rai, Thailand

Show simple item record

dc.contributor.author Jirasin Punyawong en_US
dc.date.accessioned 2025-07-15T07:25:03Z
dc.date.available 2025-07-15T07:25:03Z
dc.date.issued 2024
dc.identifier.uri http://mfuir.mfu.ac.th:80/xmlui/handle/123456789/797
dc.description Thesis (M.B.A.) -- International Logistics and Supply Chain Management, School of Management. Mae Fah Luang University, 2024 en_US
dc.description.abstract The increasing demand for consumable ice in Thailand has been significantly driven by global warming and the post-COVID-19 economic and social recovery. As a result, Thai consumers are incorporating more ice into their daily beverage consumption, particularly within the food and beverage industry. Despite this rising demand, the number of new ice manufacturing facilities has been steadily declining since 2016, highlighting the existence of operational challenges and industry risks that may hinder future growth. This study aims to identify, assess, and prioritize the potential risks faced by the consumable ice manufacturing industry. Data was collected through field observations and in-depth interviews with key stakeholders in the production sector. The Failure Mode and Effects Analysis (FMEA) method was applied to evaluate the severity, occurrence, and detection of each identified risk, allowing for a structured ranking of risk factors. Subsequently, the findings from the FMEA were integrated with a Multi-Criteria Decision-Making (MCDM) approach to develop strategic recommendations. These recommendations consider both feasibility and operational impact to ensure practical implementation. The study provides actionable insights to enhance risk management practices and support the sustainable development of the ice manufacturing industry in Thailand. en_US
dc.language.iso en en_US
dc.publisher Mae Fah Luang University. Learning Resources and Educational Media Centre en_US
dc.subject FMEA en_US
dc.subject MDCM en_US
dc.subject COVID-19 en_US
dc.subject Risk Assessment en_US
dc.title Operational risk assessment framework for consumable Ice manufacturing industry: A case study of Chiang Rai, Thailand en_US
dc.type Thesis en_US
dc.contributor.advisor Samatthachai Yamsa-ard en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account